Door Hardware Drawings 2026: PDF, DWG, STEP and BIM Compared, and What a Factory Can Actually Give You

Asking a hardware factory for "the CAD" produces a different file in every country, and half the time the file you get cannot do the job you wanted it for. This page separates the three kinds of drawing that answer three different questions, compares the formats and what each one is really for, explains why a 3D solid often does not exist even at a competent factory, and states our own drawing coverage as a number rather than a promise.

Johnson LiuDigital Communications, Canton HylandMA Digital Media, Johns Hopkins University

"Can you send the CAD?" is the most common technical request a hardware factory receives and the least specific. CAD is not a format, and the three things people mean by that sentence need three different files.

The cost of the ambiguity is a week. A buyer asks, a factory sends what it has, the buyer discovers it will not do what they needed, and the exchange restarts with better words that could have been used the first time.

Three drawings that answer three different questions

Before the format, decide which question you are asking. Almost every mismatched request is really a mismatch here.

Scroll sideways to compare columns. Select a column heading to sort; select it three times to restore source order.

Three drawings that answer three different questions
General arrangementWhat does it look like and roughly how big is itSelection, a schedule, a client presentation
Dimensioned drawingExactly how big is every part of itChecking fit, writing a specification, comparing two products
Installation templateWhere do the holes goCutting a door or frame

3 rows · Source order

A general arrangement will not let you cut a door. A template will not tell you whether the lever clears a return wall. Asking for "a drawing" and receiving the wrong one of these three is not the factory being unhelpful; it is the question having three answers.

The formats, and what each is honestly for

Scroll sideways to compare columns. Select a column heading to sort; select it three times to restore source order.

The formats, and what each is honestly for
PDFA fixed page anyone can openAuthoritative dimensioned drawings, templatesBe edited or measured reliably on screen
SVGVector, scales without blurringWeb drawings, printing at any sizeCarry CAD metadata or layers
DXFAn interchange format most CAD readsGetting 2D geometry into your own CADGuarantee layers or annotation survive
DWGAutoCAD's native 2D/3D fileEditing in AutoCADBe opened by everyone; versions differ
STEP / IGES3D solid geometryClash detection, machining, 3D assemblyExist if nobody modelled the part in 3D
Revit / IFCA BIM object with data attachedBuilding models, coordinationBe produced from a 2D drawing without real modelling work

6 rows · Source order

The row worth reading twice is the last one. A BIM family is not a file format conversion of a drawing — it is a modelled object carrying parameters, and producing it is a separate piece of work with its own cost. A factory that says "yes" to BIM and sends a PDF renamed has not misunderstood the format; they have deferred the discovery.

Why a 3D solid often does not exist

This surprises people, and it is worth explaining because it is not a sign of an unserious factory.

A great deal of hardware is designed and tooled in 2D. The die is cut from 2D profiles, the machining is programmed from 2D, and the part is inspected against 2D drawings. Nobody ever needed a solid model, so nobody made one.

That means a request for STEP can be answered honestly with "that does not exist" by a factory that has made the part for fifteen years and can give you every dimension of it. The correct follow-up is not to doubt them; it is to ask whether a dimensioned 2D drawing will serve, because usually it will.

Where a 3D model genuinely matters — clash detection in a coordinated model, or a machining operation on your side — say what you need it for. A factory that knows the purpose can sometimes produce the specific section you need rather than a whole solid.

A drawing without tolerances is a nominal drawing

Every dimension on a drawing is a target. What a drawing may or may not tell you is how far from that target the real part is allowed to be.

This matters most where two parts have to meet: a lock case in a pocket, a spindle in a follower, a glass fitting on a pane. A nominal 29mm case in a nominal 29mm pocket does not fit; the pocket needs clearance, and the clearance comes from the tolerances rather than from the nominal figures.

So when fit is the question, ask explicitly whether the drawing carries tolerances, and if it does not, ask what the working clearance should be. A factory can answer that from experience even when the drawing does not print it.

What makes a drawing authoritative

A title block with the model number, a revision number and a date. A scale, or an explicit "not to scale". Units stated, once, unambiguously. A projection convention — first angle or third angle — because the same part drawn in the two conventions puts the side views on opposite sides.

What does not make a drawing authoritative: being a screenshot, being a photograph of a printed drawing, or arriving with no revision number. A drawing with no revision cannot be superseded, which means nobody can tell whether it is the current one.

Our own coverage, as a number

Suppliers describe drawing availability in adjectives. Here it is in figures, counted from what is actually on the site.

Scroll sideways to compare columns. Select a column heading to sort; select it three times to restore source order.

Our own coverage, as a number
Products in the catalogue924
Dimensioned drawings published84
Door preparation drawings published95
Native editable CAD (DWG source)none
BIM / Revit familiesnone

5 rows · Source order

Eighty-five dimensioned drawings against 924 products is roughly nine per cent, and stating it that way is deliberate. It tells you the honest thing: for most models the specification table is what exists, and a drawing has to be requested and may have to be produced.

The published drawings are SVG, which means they scale to any size without going soft and print cleanly at A3 or A0. They are not CAD source and we do not describe them as CAD.

How to ask so that the first answer is the right one

Name the question, not the format. "I need to check the lever clears a 90mm return wall" gets you a dimensioned elevation; "send the CAD" gets you whatever is nearest to hand.

State what you will do with it. Cutting a door, building a model, comparing two products and writing a schedule are four different needs and three different files.

Say which model numbers, exactly. A drawing request for a range is a request the factory cannot fulfil in one action, and it will come back as a question.

Say the units you work in. We publish millimetres and give imperial equivalents on the English pages, but a drawing dimensioned in both is a drawing with twice the chance of a transcription error, so it is better to know which you want.

When there is no drawing, and you need one anyway

For most of our catalogue this is the real situation, so it is worth saying what to do rather than leaving the reader at nine per cent.

The fastest route is a sample and a caliper. A physical part answers every dimensional question a drawing would, and it answers them for the part you will actually receive rather than for the part somebody drew. Our page on samples and incoming inspection covers what to ask for and what to measure when it arrives.

What happens next is the part that matters, and it is a question of ownership rather than of measurement. A dimension you took off a sample is your measurement. If you put it in a specification and a door is cut to it, responsibility for that number has moved to you — and a factory that later ships a part half a millimetre different has not necessarily done anything wrong, because a nominal and a tolerance were never agreed between you.

So measure the sample, then send the numbers back and ask the factory to confirm them in writing. That converts your measurement into their statement, which is what a drawing would have been. It costs one email, and it is the whole difference between a dimension and an assumption.

Two measurements are worth taking even when a drawing does exist, because they are the two drawings most often leave out. The first is the working clearance a part needs in its pocket or bore, as opposed to its own nominal size — covered above, and the reason a 29mm case does not enter a 29mm pocket. The second is the true projection measured from the finished face of the door rather than from the rose, which is what decides whether a lever clears a return wall.

Both are the difference between a part that fits on paper and a part that fits. Neither takes more than a minute with the sample in your hand, and both are cheaper to establish now than to discover after a container of doors has been machined.

The gap we are not going to paper over

Nine per cent drawing coverage is not a boast. It is the number, and the missing drawings are missing because they have to be produced from the real part rather than generated from a description.

We would rather publish that figure than publish 924 plausible drawings. A drawing is the specification's second draft — the photograph is the first — and a drawn dimension that nobody measured is the same error as an invented figure in a spec table, with the added weight that somebody will cut a door to it.

Questions this answers

What is the difference between a general arrangement, a dimensioned drawing and a template?

They answer three different questions. A general arrangement says what it looks like and roughly how big it is. A dimensioned drawing says exactly how big every part is. A template says where the holes go. A general arrangement will not let you cut a door, and a template will not tell you whether a lever clears a wall.

Which drawing format should I ask for?

PDF for an authoritative dimensioned drawing or template. DXF to get 2D geometry into your own CAD. STEP or IGES only if you genuinely need 3D solids. Revit or IFC is a BIM object with data attached, not a format conversion of a drawing — producing one is separate work with its own cost.

Why can't the factory send a 3D model?

Because a great deal of hardware is designed, tooled, machined and inspected entirely in 2D. Nobody ever needed a solid model, so nobody made one. A factory that has made a part for fifteen years and can give you every dimension of it can still honestly say the STEP file does not exist.

Does a drawing include tolerances?

Not always, and it matters wherever two parts meet. A nominal 29mm lock case in a nominal 29mm pocket does not fit — the clearance comes from tolerances, not from the nominal figures. If fit is the question, ask explicitly whether tolerances are on the drawing and what working clearance to allow.

How many of your products have drawings?

84 dimensioned drawings and 95 door preparation drawings across 924 catalogue products — roughly nine and ten per cent. We state it as a number rather than an adjective so you know that for most models the specification table is what exists and a drawing has to be requested.

What makes a drawing authoritative?

A title block with model number, revision and date; a stated scale or an explicit "not to scale"; units stated once and unambiguously; and the projection convention, because first and third angle put the side views on opposite sides. A drawing with no revision number cannot be superseded, so nobody can tell whether it is current.

About Canton Hyland — Canton Hyland manufactures panic exit devices, locks and architectural door hardware for commercial and institutional projects, supplying specifiers and distributors internationally.

Newsletter

The Canton Hyland newsletter covers new product families, standards updates and export documentation changes.

Copyright © 1998-2026 Canton Hyland Hardware (Group) Co., Ltd.